The overall CAPEX & OPEX needs to be integrated with maximum efficiency and product quality with seamless integration between steam and Power required for the process plant.
The remote location and challenging working conditions led to difficulties in sourcing contractors willing to work on-site.
Ensuring that the necessary skilled labor was available and motivated to complete the project on time required creative problem-solving and strong leadership.
Successfully delivered a turnkey plant operating within defined performance parameters, ensuring consistent quality, quantity, efficiency and full Zero Liquid Discharge (ZLD), reinforcing our commitment to sustainability and excellence.